Southern Utah's Water Future: Reservoirs, Reuse, and Conservation
Southern Utah water projects explained: Chief Toquer Reservoir, the regional reuse system, the La Verkin demo facility and conservation rules.
Washington County gets nearly all of its water from the Virgin River watershed, and that watershed is close to fully developed. With the Lake Powell Pipeline on hold, the county's plan for future growth rests on three things: more local storage, reusing treated wastewater, and conservation. Here's where each of those efforts stands and what it means for people buying homes in the area. To see what's for sale, browse homes for sale in St. George.
Where the Water Comes From Now
According to the Washington County Water Conservancy District, local suppliers deliver about 45,000 acre-feet of drinking water a year, almost all of it from the Virgin River system. Two off-stream reservoirs do much of the work: Quail Creek Reservoir, completed in 1984, and Sand Hollow Reservoir, completed in 2002, which also recharges the sandstone aquifer beneath it. Upstream storage and local wells round out the supply.
New Storage
Chief Toquer Reservoir
The newest reservoir under construction is Chief Toquer, near Toquerville, part of the district's Ash Creek project. Construction was underway in 2026, with the district hoping to begin filling it after a good runoff season.
Other proposed reservoirs
The district has also studied smaller reservoirs elsewhere in the county, including Graveyard Wash, a reuse-water storage site in the Santa Clara and St. George area that was still moving through agreements in 2025, and Dry Wash in Ivins, which drew neighborhood opposition in 2024. A site in the Warner Valley area east of St. George has also been considered. Plans for these projects can change, so check the district's current project list for the latest status.
Water Reuse
Reusing treated wastewater is the largest new source in the county's plan. The district's regional reuse system, reported in early 2025 to carry an estimated cost of about $1 billion, is expected to supply up to 24,000 acre-feet a year by 2042, with work starting on its first phases.
On the east side of the county
A $43 million reclamation facility at Confluence Park, built by the Ash Creek Special Service District with the conservancy district, is designed to treat up to 1.5 million gallons of wastewater a day from La Verkin, Toquerville and Hurricane. That water is planned for irrigation, with winter storage to help meet summer demand.
The district also plans a $7 million advanced water purification demonstration facility in La Verkin, where visitors will be able to tour the treatment process and taste purified reuse water. It's planned to open around 2028. The district doesn't expect purified reuse water to enter the drinking supply until about 2040.
Bigger Treatment Capacity
The Quail Creek Water Treatment Plant is being rebuilt to raise its capacity from 60 million to 90 million gallons a day, mainly to keep up with peak summer demand.
Conservation
Conservation is treated as a source of supply. A 2025 regional conservation plan set a goal of cutting water use 18% between 2022 and 2042. For homeowners, that shows up as:
- Landscaping limits on new homes: St. George, Washington, Santa Clara, Ivins and Hurricane adopted water efficiency standards in 2022 that cap lawn on new residential lots.
- Grass-replacement incentives: the district pays homeowners to replace lawn with water-efficient landscaping, in exchange for a conservation easement on the converted area that stays with the property.
- Tiered rates and surcharges: heavy summer use costs more, especially for newer homes.
The district's programs and current rules are on the Washington County Water Conservancy District website.
For quick answers to the most common questions, see whether St. George is running out of water.
What It Means for Buyers
- New construction: regional water impact fees are built into new-home costs, and new lots come with smaller lawn allowances.
- Older homes: larger existing lawns are allowed but can bring high summer bills, so ask for 12 months of utility bills.
- Converted yards: if a previous owner took a lawn-replacement incentive, a recorded easement may prevent reinstalling grass. Ask the title company.
For a broader look at living with the desert climate, see the St. George cost of living guide, which covers summer utility bills.
Bottom Line
Southern Utah isn't counting on a pipeline to grow. New storage, a large reuse system and steady conservation are meant to carry the county for the next two decades, and buyers will feel those choices in landscaping rules, impact fees and summer water bills. For help weighing those factors on a specific home, contact Best Utah Real Estate.
Posted by Kristopher Larson
Frequently asked questions
Where does Southern Utah get its water?
Nearly all of Washington County's water comes from the Virgin River watershed, through reservoirs such as Quail Creek and Sand Hollow plus local wells. The Washington County Water Conservancy District reports that local suppliers deliver about 45,000 acre-feet of drinking water a year.
Is Chief Toquer Reservoir finished?
Chief Toquer Reservoir near Toquerville, part of the Ash Creek project, was under construction in 2026, with the district hoping to begin filling it after a good runoff season.
Will Washington County drink recycled water?
Eventually, but not soon. The district's regional reuse system is expected to supply up to 24,000 acre-feet a year by 2042, and a demonstration purification facility in La Verkin is planned to open around 2028. The district doesn't expect purified reuse water to enter the drinking supply until about 2040.
What is happening with the Lake Powell Pipeline?
It's on hold. The Washington County Water Conservancy District shifted its focus to conservation, reuse and local storage for roughly the next 20 years, so near-term planning in the county assumes no pipeline water.
How do water rules affect homebuyers in St. George?
New homes face lawn limits and carry regional water impact fees in their price, while older homes may have bigger lawns and higher summer bills. Ask for a year of utility bills and check whether the yard is covered by a conservation easement from a lawn-replacement incentive.
What is Southern Utah's water conservation goal?
A 2025 regional conservation plan set a goal of cutting water use 18% between 2022 and 2042, using landscaping standards for new construction, lawn-replacement incentives, and tiered rates and surcharges.
St George, Utah housing market
A quick read on what homes are doing in St George right now — pulled live from the MLS.
Keep reading
More from the blog
St. George Asking Prices Are 24% Below the 2022 Peak: What Late-2026 Buyers Should Weigh
What $800,000 Buys in St. George and Southern Utah, Town by Town
Luxury Neighborhoods in St. George and Southern Utah: 7 to Know